CH CONSTRUCTION SERVICES · NORTH WEST

Groundworks & civils.
Built on experience.

Groundworks, civil engineering and builders’ works for principal contractors. Experienced teams for live hospitals, operational ports and major developments.

Established 2013Based in Radcliffe, Manchester
CHCS excavators carrying out cut and fill earthworks at The Sumners development in Preston
ON SITEThe Sumners, Preston
Earthworks & lower ground floor formation

Project experience
with principal contractors

IHP / VINCIGlencarAIM ConstructionDawnvale

01 / OUR SERVICES

The capability your
project needs.

From preparing the site to completing the external works, we deliver coordinated packages around your programme, access and existing infrastructure.

01

Groundworks & earthworks

Site clearance, enabling works, cut and fill, excavation and formation for new developments and existing estates.

SITE PREPARATION
02

Drainage & service diversions

Foul and surface water drainage, service channels, ducting and careful work around existing underground services.

BELOW GROUND
03

Foundations & concrete

Foundation excavation, reinforcement, bases, concrete pads and slab repairs, with attention to the finished work.

SUBSTRUCTURE
04

External works

Kerbing, paving, surfacing and reinstatement, coordinated with drainage, site access and surrounding operations.

FINISH & REINSTATEMENT
05

Builders’ works & alterations

Brickwork, blockwork, structural openings, lintels, joinery and diamond drilling for refurbishment and construction packages.

BUILDING WORKS
06

Coordinated work packages

Groundworks and building trades brought together under CHCS supervision, with plant and teams suited to the scope.

ONE DELIVERY TEAM

02 / SELECTED PROJECTS

Experience on
complex sites.

Healthcare, ports and residential development. Real projects, real site photographs and practical experience working alongside principal contractors.

Substation building and CHCS groundworks at Aintree Hospital North SiteHEALTHCARE

IHP / VINCI · LIVERPOOL

Aintree Hospital

Enabling works, drainage and a substation package, with further civils across a live hospital estate.

View project scope

North Site: enabling works and substation construction from foundations and drainage through to the roof.

Facilities Site: enabling works, service investigation, drainage, channels and service routes.

Live hospital environment

CHCS service diversion work with controlled barriers and vacuum excavation at Peel Ports Seaforth DocksPORTS & INDUSTRIAL

GLENCAR · SEAFORTH DOCKS

Peel Ports

Service diversions and associated civils to support welfare facilities within an operational dock.

View project scope

Controlled excavation, exposure of existing services, joint bay works and service diversions.

Concrete pads and associated works, with quality checks during placement and finishing.

Operational port environment

Completed CHCS concrete foundations at The Sumners residential development in PrestonRESIDENTIAL

AIM CONSTRUCTION · PRESTON

The Sumners

Block 2 civils and groundworks for an apartment development, from substantial cut and fill to foundations.

View project scope

Earthworks and lower ground floor formation, foundation excavation, reinforcement, concrete pours and associated groundworks.

Plant and site teams working through the changing requirements of the development.

Apartment development

Further project experience includes The Christie Hospital, Henry Cotton Building, Stockport 8 and the Etihad Stadium.

03 / HOW WE WORK

Accountable people.
Careful delivery.

Director-led delivery, experienced site supervision and clear communication with your project team.

Quality is a site decision.

At Peel Ports, we rejected an unsuitable concrete load, stopped the pour and removed the material already placed. The pads were completed the following day to the required finish.

01

Understand the site

Review the scope, existing services, access and operational constraints before work starts.

02

Plan and brief the work

Site-specific RAMS, permits and daily briefings support the work. Coordinate deliveries, plant movements and work areas with the principal contractor.

03

Manage the interfaces

Keep supervision close to the work and communicate issues early, particularly around live services, occupied buildings and other trades.

04

Check the finished work

Inspect the installation, address defects and provide the relevant project records for handover.

04 / COMPANY CREDENTIALS

Ready for your
supply chain.

Accreditation certificates, insurance documents and project references are available for your prequalification and procurement review.

SMAS

SMAS accredited

Health and safety accreditation

GOLD

Constructionline Gold

Supply chain prequalification

£10m

Employers’ liability

2026/27 insurance cover

£5m

Public liability

2026/27 insurance cover

Insurance period: 17 July 2026–16 July 2027. Cover is subject to policy terms.

Request company documents

05 / LET’S TALK

Your next project
starts here.

Send us your drawings, scope of works or tender enquiry. Speak directly with Craig Hamilton about the package and your programme.

Email Craig

CRAIG HAMILTON · DIRECTOR

07729 460 637

FIND US

Unit G4, Constellation Mill
Radcliffe, Manchester, M26 4AD